Water treatment plants, reservoirs & wastewater plants
From water-treatment basins and wastewater tank linings to construction joints, leaking cracks and plant-building roofs: we choose the system for the water and chemicals involved, then build it up in the right order, from substrate to top coat. When PASSAWARN installs, the manufacturer’s warranty applies.
Companies we’ve worked with
MWA · PTT · PTT Global Chemical · Siam City Concrete
Tap a part to see how its layers are built and where we’ve done it.
For new basins and tanks, a waterproofing admixture goes into the concrete at the batching plant, so the concrete itself becomes far less permeable. Joints and cracks are still detailed separately.
Layer thicknesses are exaggerated for clarity. Built up from the bottom.
Our work on this part
Metropolitan Waterworks AuthorityIntegral admixture
Also with this method: Metropolitan Waterworks Authority – Samrong Branch Office · Metropolitan Waterworks Authority – Lat Phrao Branch Office · Metropolitan Waterworks Authority – Min Buri Branch Office · Metropolitan Waterworks Authority – Lat Krabang Branch Office · Metropolitan Waterworks Authority, Bang Phli Branch
Not just a contractor’s promise, but a promise from the technology owner. We deliver whatever brand the spec calls for.











Tell us whether it holds clean water or wastewater, how long it can be drained, and which chemicals or chlorine it sees. We’ll check the site and propose the right system.